Buildings
Management
Building :
|
 |
Will power and determination to do
the best, and the best only, is manifested
in the design and execution of the
management building. It is a
concrete building comprises of three floors
with a space of 1000 square meters for each
floor. Work on this building has been
accomplished in a remarkably short
time of 160 days through professional
manpower, advanced technologies,
electro-mechanic cooperation between
departments to reach the highest standards
of quality. |
|
 |
 |
Clinics Building :
|
 |
This building comprises of two sections,
one is reinforced concrete and the middle
one is steel structure. Total space of the
building is 550 square meters and it has
been accomplished in a remarkably short time
with close coordination of the
electro-mechanic department in order to
reach the highest standards of quality as
per the required specifications and to
finally fix the pre-shaped building fronts. |
|
 |
 |
Transportation Buildings (1):
|
 |
This is a steel structure building. Works
of concrete and base of this building have
been accomplished in a remarkably short time
with a total space of 12,500 square meters.
Coordination with electro-mechanic
departments has taken place to ensure
execution as per the required
specifications. |
|
 |
 |
Transportation Buildings (2):
|
 |
This building comprises of two sections,
steel structure and reinforced concrete.
Works of concrete and base of this building
have been accomplished in a remarkably short
time with a total space of 1,500 square
meters. Coordination with electro-mechanic
departments has taken place to ensure
execution as per the required
specifications. |
|
|
 |
Fire Station:
|
 |
This building comprises of two sections,
steel structure and reinforced concrete.
Total space for the two sections is 3,000
square meters. Coordination with
electro-mechanic departments has taken place
to ensure execution as per the required
specifications. The concrete and finishing
parts have been executed via block cement
and plastering using savito material in
accordance with industry standards. |
|
 |
Amusement Building:
|
 |
This is a reinforced
concrete building
with a total space
of 1,500 square
meters and 20 meters height. Regular steel
and concrete works have been executed in the
site as a support to the main contractor
during the initial stages of the project. |
Stadium:
|
 |
Supply and execution of regular steel and
concrete works for the foundations,
according the required specification, as a
support during the initial stages of the
project. |
Generators / Power
Stations Building :
|
 |
Regular steel and concrete works have
been executed in the site as a support to
the main contractor during the initial
stages of the project. |
Villas & Edifices
Villa Design (1):
|
 |
These are villa buildings with different
models, types, and spaces; with a concrete
structure and pre-shaped fronts which vary
according to space and specifications of the
villa whether it is ground floor, first
floor, or second floor. Work on these villas
has been accomplished in a remarkably short
time through professional manpower and
coordination among the different departments
as per project requirements. |
|
 |
 |
Edifices:
|
 |
These are buildings
comprising of 4 floors. Main structure is
concrete and ceilings are pre-shaped hollow
core. Work has been accomplished in a
remarkably short time. |
|
 |
 |
Central Kitchen:
|
 |
This is a steel
structure building with a total space of
12,500 square meters. Works of concrete and
base of this building have been accomplished
in a remarkably short time of 120 days, and
coordination with electro-mechanic
departments has taken place to ensure
execution as per the required
specifications. |
|
 |
 |
|