Buildings

      Management Building :

Will power and  determination to do the best, and the best only, is manifested in the design and execution of the  management  building. It is a  concrete building comprises of three floors with a space of 1000 square meters for each floor. Work  on this building has been  accomplished  in a remarkably short time of 160 days through professional  manpower, advanced technologies, electro-mechanic cooperation between departments to reach the highest standards of quality.


     Clinics Building :  

This building comprises of two sections, one is reinforced concrete and the middle one is steel structure. Total space of the building is 550 square meters and it has been accomplished in a remarkably short time with close coordination of the electro-mechanic department in order to reach the highest standards of quality as per the required specifications and to finally fix the pre-shaped building fronts.


      Transportation Buildings (1):   

This is a steel structure building. Works of concrete and base of this building have been accomplished in a remarkably short time with a total space of 12,500 square meters. Coordination with electro-mechanic departments has taken place to ensure execution as per the required specifications.


     Transportation Buildings (2):

This building comprises of two sections, steel structure and reinforced concrete. Works of concrete and base of this building have been accomplished in a remarkably short time with a total space of 1,500 square meters. Coordination with electro-mechanic departments has taken place to ensure execution as per the required specifications.

 


    Fire Station:

This building comprises of two sections, steel structure and reinforced concrete. Total space for the two sections is 3,000 square meters. Coordination with electro-mechanic departments has taken place to ensure execution as per the required specifications. The concrete and finishing parts have been executed via block cement and plastering using savito material in accordance with industry standards.


      Amusement Building:

This is a reinforced    concrete    building   with  a total    space of 1,500   square    meters and 20 meters height. Regular steel and concrete works have been executed in the site as a support to the main contractor during the initial stages of the project.


      Stadium:

Supply and execution of regular steel and concrete works for the foundations, according the required specification, as a support during the initial stages of the project.


      Generators / Power Stations Building :

Regular steel and concrete works have been executed in the site as a support to the main contractor during the initial stages of the project.


Villas & Edifices

      Villa Design (1): 

 

These are villa buildings with different models, types, and spaces; with a concrete structure and pre-shaped fronts which vary according to space and specifications of the villa whether it is ground floor, first floor, or second floor. Work on these villas has been accomplished in a remarkably short time through professional manpower and coordination among the different departments as per project requirements.


     Edifices:  

 

These are buildings comprising of 4 floors. Main structure is concrete and ceilings are pre-shaped hollow core. Work has been accomplished in a remarkably short time.


      Central Kitchen:  

 

This is a steel structure building with a total space of 12,500 square meters. Works of concrete and base of this building have been accomplished in a remarkably short time of 120 days, and coordination with electro-mechanic departments has taken place to ensure execution as per the required specifications.